Skip to content

Gregory Water Treatment Plant Supply Philosophy Review

Gregory Water Treatment Plant Supply Philosophy Review

Bundaberg Region, QLD

Project Details
The Gregory River Water Supply Scheme encompasses the separate water supply areas of Childers and Woodgate Beach, which are both supplied via pumped flows from the Gregory River Water Treatment Plant (WTP).

The service area was experiencing a range of challenges. The objective of this project was to review the overall operational efficiency and resilience of the Gregory WTP supply catchment.

Services Rendered
• Future demand assessment
• Network hydraulic modelling
• Level 1 AC pipe condition assessment, including pressure vs residual life curve
• Physical testing for system curve calibration
• Energy optimisation strategies for supply catchment
• Feasibility review of lift station relocation
• Water hammer modelling to assess risk to transfer mains
• Study Report

Get In Touch

Ready to start your next project? Let Engenera bring your vision to life with our expert engineering services. Whether you’re looking for civil, water, or structural engineering solutions, our team is here to support you every step of the way.

Let’s build the future together.

Get In Touch

Ready to start your next project? Let Engenera bring your vision to life with our expert engineering services. Whether you’re looking for civil, water, or structural engineering solutions, our team is here to support you every step of the way.

Let’s build the future together.

Secret Link